Install 2 layers of weather resistant barrier.
Certainteed cement siding installation guide.
If using screws to fasten fiber cement siding such as to metal studs be sure that at least three threads penetrate the studs.
Apply 1 spots of asphalt roofing cement under each corner and at about 12 to 13 in from each edge.
Xx leave 1 8 gap between siding and trim surrounding windows and doors.
Xx do not install fiber cement directly in contact with surfaces that collect water.
Apply a coat of mortar.
Click here to learn more from certainteed.
Staples must not be used.
Continuing drying for the day day 6.
Certainteed will pay 103 9 million to settle the class action approved by the court.
Continuing drying for the day.
6 clearances xx hold back siding a minimum of 6 above the finished grade.
Certainteed offers over 40 color choices for your personal vision for your home s exterior design.
Certainteed fiber cement siding installation guides contain similar admonitions.
Install the next piece so its end butts lightly against the first photo 7 inset.
Asphalt roofing cement should meet astm d 4586 type ii.
Adhesives to install fiber cement siding.
Make a cut 1 1 2 at the 90 bend of the lineal face and inside locking edge.
Please print this document by clicking the print icon in the web viewer.
Measure and cut to length the first piece of siding and nail it in place photo 7.
Xx allow a minimum of 1 2 above roof lines porches decks etc.
Provides important advice for building owners troubled by gaps that appear in fiber cement exterior siding after the product has been installed and in service for some time.
An alternative to using new construction window starter is to use 1 2 j channel as a starter.
Overlap the lineals 1 by fitting the notched lineal over the un notched lineal.
Use six nails and four spots of.
Apply mortar to back of stone press onto the scratch coat let dry for the day.
Use six nails and four spots of asphalt roofing cement for every full shingle for every full shingle as shown below.
Nails must be round head non corrosive and either double hot dipped galvanized or stainless steel.
Gap where the end meets the corner board photo 7 inset and make sure the other end lands on a stud line.
Create a scratch coat in the mortar let dry for the day.
The settlement is intended to resolve disputes between the parties about the performance of the siding.
Trim 1 1 2 from the nail flange and receiving channel.